Présentation :
Eel lift is installed in the works with hard made ueven. It has a trapping system built in the downstream of the dam and a fishpond storage which is periodically emptied in the upstream level to the restraint.
Eel lift is installed in the works with hard made ueven. It has a trapping system built in the downstream of the dam and a fishpond storage which is periodically emptied in the upstream level to the restraint.
Installation :
It can be built in every site. A study is necessary in order to specify its setting-up and its configuration.